Post 43: Bulk Dig Done, Acoustic Screen Up and Setting Out the Slab
The bulk excavation is finished and the site finally looks like a building site. A DIY acoustic screen cuts the pump noise by about 25 dB, the grid goes up on the profiles, and the thickenings are being set out.
Post 42: Detailed Excavation, Profiles and Watching the Sheets Move
The dewatering is cranking up and the dig is under way. Digging out the slab thickenings, fixing profiles to the sheet piling for the surveyor, and what the daily monitoring is showing.
Post 41: Digging While We Wait on the Water
The water is still being tested, so the dewatering is only trickling. The bulk dig starts anyway, the sheet piles get scraped clean, a second sediment curtain goes in, and the cost of waiting adds up.
Post 40: Inside the Dewatering Treatment Plant
The dewatering is installed and we're testing the treated water. A walk through the treatment plant, why iron has to come out before anything goes in the canal, what it costs, and a budget acoustic enclosure for the neighbours.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS