Topic · 130 guides
Before Construction
Prepare effectively with insights on land purchase, permits, and selecting contractors. Constructor guides you through essential pre-building steps to ensure a successful start to your home-building journey. Equip yourself with the knowledge needed for a smooth and informed process.
Page 8 of 33
Post 39: Dewatering Installed and Waiting on the Water Test
The header main is in and every spear is connected. How the system is sealed, primed and flushed, why the water test decides the treatment plant, and what the finished basement edge will look like.
Post 38: Spears In, Sheet Piles Pinned and a Lot of Mud
Day four of the dewatering install. Every spear is in, the sheet piles are pinned to the boundary footing with 24 mm dowels, and the site is a sludge fest of canal water.
Post 37: Jetting in the Dewatering Spears
A short, silent clip of the dewatering crew jetting a spear into the ground, dropping the spear in and packing it with filter gravel. Here's what each step does.
Post 36: Dewatering Mobilises: Spears, Monitoring and Keeping the Water Out
The dewatering crew is on site. How spear points pull the groundwater down, how we're monitoring the wall and sheet piles for movement, and how the basement will be kept watertight.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS