Topic · 130 guides
Before Construction
Prepare effectively with insights on land purchase, permits, and selecting contractors. Constructor guides you through essential pre-building steps to ensure a successful start to your home-building journey. Equip yourself with the knowledge needed for a smooth and informed process.
Page 6 of 33
The Constructor Field Manual: Know What to Ask, Before You Need to Ask It
A year ago we said our checklists were chonky, and promised to break them down. This is it: every check by stage, with what good looks like, so you know what to ask before you need to ask it.
Post 46: Steel Fixing, Tanks Formed and Waterproofing Details
The first 18 tonnes of slab steel are craned in, the sewer and stormwater tanks are formed in Rediwall, and the water stops and Sika waterproofing are being detailed before the tanks are backfilled.
Post 45: Blinding Down, Set-Out Done and Planning the Tanks
The blinding slab is down and set out, the sewer and stormwater tank walls have arrived, and the waterproofing for the tanks and basement walls is being designed ahead of a 250 m³ monolithic pour.
Post 44: Hand-Shaping Thickenings and Starting the Drainage
A week of careful work you can't see much of: hand-shaping the slab thickenings, setting height pins for the blinding, the first sheathed sewer pipe, and a dewatering failure that flooded the pits.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS