Trade Specifications: Agree the Scope Before You Award the Job
Most arguments with trades start at the end of a job. A signed trade specification moves that conversation to the start, where it belongs.
Post 55: Standing Up the Rediwall Basement Walls
A week after the slab pour, the Rediwall basement walls are going up. How the track goes down, why a swelling waterstop sits under every wall, how the steel goes in, and how we'll waterproof the outside before 200 cubic metres of gravel goes in behind.
Post 54: The Basement Slab Is Down, and the Walls Begin
The basement raft is poured in one hit, 228 cubic metres with a 50 metre boom pump and 15 concreters. The day after, we strip the forms, set out the grid on the slab and start getting ready for the Rediwall basement walls.
Post 53: Pre-Pour Inspection Part 2, Checking the Slab Itself
Part 2 of the pre-pour slab inspection. With the outside checked, I walk up to the slab, starting with the setbacks and the boxing, then the steel, pipes and set downs, and finish with a walk around the basement raft before Monday's pour.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS