You've got the plans, you've got three quotes, and you've picked a trade. A handshake, a deposit, and they start Monday.

Then the job finishes, and you look around and think: is that it? What about the sealing around the window? Who was doing the flashing? I thought the falls were included?

That moment is uncomfortable for everyone. The trade thinks they've done the job they priced. You think you're being short-changed. Neither of you is lying. You just never agreed on the same job.

I've spent 26 years on building sites in Brisbane as a licensed builder and waterproofer, and that end-of-job argument is one of the most common problems I see. It's also one of the easiest to prevent. That's why we built the C28 Trade Specifications.

What a trade specification is

A trade specification is a plain-English scope of works for one trade package. It sets out what the work includes, how it should be done, and what it will be checked against when it's finished.

The C28 pack has 37 of them. There's a set of general conditions that applies to every trade, plus 36 trade specs covering the whole build:

  • demolition, earthworks and piling
  • slab, framing, roofing, windows and cladding
  • plumbing, electrical and air conditioning
  • waterproofing, tiling, joinery and painting
  • landscaping, retaining walls, solar and pools

Builders and architects have used detailed specifications for decades. They are usually long, technical and written for other professionals. These are written for homeowners, renovators and owner builders, so you can sit down with a trade and actually work through one together.

What's in each spec

Every spec follows the same layout, so once you've used one you can use them all.

  • Page 1: the job. Property address, the trade's company name, licence number, ABN and insurance, what's included, the agreed price and dates. There's also a Who does what table, so it's clear which tasks belong to this trade and which belong to someone else.
  • The scope items. Each item is a short plain-English requirement with a reference to the NCC or Australian Standard behind it. Next to every item are three boxes: Applies, N/A and Met.
  • Deliverables. What the finished work is assessed against, and how each one is checked.
  • Documents to collect. Certificates, warranties, test results and photos you should have in your hand at the end.
  • A hold point. The moment you (or your inspector) must see the work before it's covered up.
  • Sign-off. Part 1 is signed by both of you before work starts. Part 2 is signed by both of you when the work is complete.

The PDFs are fillable, so you can type into them or print them and write by hand.

How to use it

  1. Send it with your plans when you ask for quotes. The trade prices the same scope you expect, and you can compare quotes properly.
  2. Walk through it together before you award the job. Go through every item, on site if you can. Tick Applies or N/A. Write notes where you agree on something different.
  3. Talk through any disagreement now. If the trade says "I don't do that" or "that's extra", you want to hear it now, while you can still talk to someone else, and not after the deposit is paid.
  4. Both sign Part 1. Initial every page.
  5. Name it in your contract. Refer to the signed spec in your subcontract or trade agreement, alongside the plans, engineering, finishes schedule and selections. It becomes part of the agreed job.
  6. Check the work against it. Tick Met as each item is done, sign the hold point before the work is covered, then both sign Part 2 at completion.

It works on new homes, renovations and owner builder projects. Use the parts that apply and mark the rest N/A.

Why signing it matters

Signing it isn't about distrust. It holds both of you to the same agreement.

Without it, standards tend to drift. An owner sees something on social media halfway through the job and suddenly expects it. A trade decides the falls weren't really their responsibility. Both of those are new standards that nobody agreed to at the start.

With a signed spec, the goal posts stay where you both put them. Most trades find that reassuring too. They know exactly what they'll be judged on, and that the job won't keep growing.

The conversation people avoid

Plenty of people skip this conversation because they don't want to upset the trade before the job even starts. It feels awkward to ask "will you be doing this?" or "how are you going to do that?"

What is far more upsetting is getting to the end and finding that X, Y and Z were never part of it. By then the trade has moved on to the next job, your money has been paid, and everyone is frustrated.

Half an hour at a kitchen table before the job starts is much easier than an argument on site at the end.

Don't assume

Don't assume a trade will do what you expect. Every trade does things a little differently. They learned from different people, they price differently, and they draw the line between their work and the next trade's work in different places.

Some of the best trades I've worked with are informal. They'll do every item on this spec without being asked, but they aren't good at paperwork. The spec suits them too. Walking through it together confirms what they were going to do anyway, and gives you both a record.

What's in it for you

  • Like-for-like quotes. Every trade prices the same scope.
  • No surprises. Exclusions come out before the job starts, not at the end.
  • A fair way to check the work. You both know what "done" means.
  • The right paperwork. Certificates, warranties and photos are collected as you go, not chased afterwards.
  • Less conflict. Disagreements are settled while they're still easy to settle.

When to use it

  • When you ask for quotes
  • Before you sign a contract or pay a deposit
  • At the hold points during the job
  • At handover

The alternative

The alternative is what most people do now: a quote with one line ("supply and install waterproofing to bathroom"), a verbal agreement, and hope. That works until it doesn't. When it goes wrong there's nothing written down, and it's your memory against theirs.

A trade specification doesn't replace your contract, your plans or professional advice. It sits alongside them and fills the gap between "what's in the quote" and "what I actually expected".

Get the C28 Trade Specifications

C28 Trade Specifications

37 plain-English trade specs, fillable A4 PDFs, 168 pages. A$119.95 for the full pack, or A$29.95 for a single trade (includes T00 General conditions).

Buy the C28 pack – $119.95   See inside  ·  Buy one trade spec

Start with T00 General conditions and the spec for your next trade. Read it before you ask for quotes, then walk through it with your trade before you award the job.

General information only, not legal or financial advice. Check which NCC edition and state rules apply to your project.