You'll hear builders and engineers talk about MEP. It stands for mechanical, electrical and plumbing, the services that move air, power and water through a building. In Australia you'll also hear it called building services or simply "services".
Why should a homeowner care? Because almost all of it disappears behind plasterboard. Once the walls are lined, a power point in the wrong spot or a waste pipe without enough fall becomes an expensive fix. The time to check is at rough-in, and that's what this post is about.
C10 - Rough In Stage Inspection Checklist
$59.00 AUD
Last updated 28 Oct 2026 · Revision 3 · Free updates for life
Checklist Type: Minor
Form Factor: Fillable, print-ready PDF (A4, 27 pages)
When to use: Rough-in stage: after services are installed, before cladding and linings go on
An 84-point rough-in checklist. Check plumbing, electrical, gas, solar, air conditioning and data after every trade has finished, before the insulation and linings hide them.
What MEP covers in a house
Mechanical
- Split-system or ducted air conditioning, including indoor heads, outdoor units, ducts and condensate drains.
- Exhaust fans in bathrooms, toilets, laundry and the rangehood, ducted to outside.
- Ceiling fans (wired by the electrician, but part of how the house handles air).
Electrical
- Switchboard, meter and main switch.
- Circuits for lights, power points (GPOs), oven, cooktop, hot water and air con.
- RCD (safety switch) protection on every final subcircuit, as required by AS/NZS 3000 for new homes.
- Hardwired, interconnected photoelectric smoke alarms, as Queensland requires in new homes.
- Data, TV and NBN cabling.
- Solar panels, inverter and battery if you're having them.
Plumbing
- Water supply from the meter, with isolation valves and a pressure-limiting valve where mains pressure is high.
- Hot water system: heat pump, solar, gas or electric storage.
- Sewer drainage and vents from every basin, shower, bath, toilet, sink and tub.
- Stormwater from gutters and downpipes to the legal point of discharge, plus any rainwater tank.
- Gas lines if you have gas appliances.
Who does the work
On a house, licensed trades do most of the design using standard details:
- Electrician: wiring, switchboard, testing and the certificate of testing and safety.
- Plumber and drainer: water, sewer, stormwater and gas, with the required compliance paperwork lodged.
- Air conditioning installer: units, ducts and refrigerant pipework (with a refrigerant handling licence).
- Builder or site supervisor: coordinates the order of works so each trade gets in at the right time and nothing clashes.
An engineer usually only gets involved for energy modelling, large or unusual air conditioning systems, or tricky site drainage.
When services go in
- Under-slab plumbing. Sewer and some water pipes are laid and tested before the slab is poured. Check positions against the plans now, because moving a toilet after the pour means cutting concrete.
- Frame stage. Once the frame and roof are up, the trades plan their routes.
- Rough-in. Cables, pipes, ducts and fan housings are run through the frame and roof space. This is the big one for homeowners.
- Lining. Plasterboard goes on and everything is hidden.
- Fit-off. Power points, switches, lights, tapware, toilets, air con heads and grilles are installed.
- Testing and handover. Electrical testing, plumbing pressure tests, commissioning of air con and hot water, and the certificates handed to you.
Many checks fall between rough-in and lining. Our C10 Rough In and C11 Enclosed checklists walk you through them.
What to check at rough-in
- Power point and switch positions match your electrical plan, at the right heights, and are not hidden behind where the fridge, bed or TV unit will go.
- Light positions work with your furniture layout and don't clash with ceiling fans or downlights in the eaves.
- Nogging (timber blocking) is installed behind towel rails, toilet roll holders, wall-hung vanities, TV brackets and grab rails.
- Waste pipes have fall back towards the drain. Pipes should be supported and not sagging.
- Shower and bath outlets are in the right spot for the tiling layout.
- Isolation valves are fitted so each fixture or area can be shut off without turning off the whole house.
- Air con ducts and the outdoor unit position are agreed, with room to service it and its condensate drain going somewhere sensible.
- Exhaust fans are ducted to outside, not dumping moist air into the roof space.
- Hot water pipe runs are as short as practical to the kitchen and main bathroom, and lagged where required.
- Penetrations through wet area walls and floors are in the right place for waterproofing.
Take photos of every wall before lining. Those photos are gold when you want to hang a picture without drilling into a pipe in ten years' time.
Five problems I see on houses
1. Air con ducts clashing with roof trusses
Ducts get squashed or kinked to fit between trusses and hold less air than designed. Rooms at the end of a run don't cool properly. Agree on duct routes and the indoor unit location before the trusses go up.
2. Missing nogging
Once the plaster is on, there's nothing solid to screw into. Walk through each room and point to everything that will hang on a wall.
3. Power points in the wrong place
Usually because the electrical plan wasn't finished, or furniture positions weren't thought through. Fixing it at rough-in is a few minutes. After plaster, it's patching and painting. See our guide to preparing your electrical and lighting plan below.
4. Waste pipes without enough fall
Drainage pipes need a minimum grade set out in AS/NZS 3500. Too flat and they block; under the slab, fixing it means breaking concrete. Check before the pour and again at rough-in.
5. No isolation valves
Without them, changing a tap washer means shutting off water to the whole house. They're cheap to put in at rough-in and a pain to add later.
Handover documents to ask for
- Electrical certificate of testing and safety.
- Plumbing and drainage compliance certificates.
- As-constructed drainage plan showing where pipes run.
- Manuals and warranties for the hot water system, air con, exhaust fans, solar and battery.
- Your rough-in photos.
Quick answers
Is fire protection part of MEP?
On houses, smoke alarms are part of the electrical work. Sprinklers and hydrants are mostly a commercial scope, often called MEPF (MEP plus fire).
Do I need an MEP engineer for my house?
Usually not. Licensed trades work to standard details. You might engage one for energy modelling, a large ducted system or difficult drainage.
Where do solar and batteries fit?
They're electrical work. Panels, inverter and battery connect to the switchboard with their own protection and metering. Plan the switchboard space and cable routes at design stage.