PROJECT 1
Post 7: Project 1: Site Prep Essentials: Dewatering, Vibration, and Service Inspections
In this post we provide an overview into dewatering and vibration management planning, neighbour protections, and service inspections that are required to be considered before construction commences (on houses with deep excavations).
Post 6: Project 1: Power, Services & Basement Considerations
Follow our commercial-spec house build from the start. We're tackling a major basement dig with high groundwater, using a Dincel and Sika waterproofing system to keep it dry.
Post 5: Project 1: Building Site Setup: The Basics
Going beyond the plans, we break down the first steps of a construction project. From demolition and lay-down areas to site amenities and permits, this is the real-world guide to setting up a safe, efficient worksite.
Post 4: Project 1: 15-11-25 Something new. 100% electric utes.
Get an exclusive first look at the Tembo 100% electric utes, the first of their kind in Australia. We take a quick look at the single cab and mine-spec dual cap prototypes, covering charging, key features, and our first impressions ahead of their 2025/26 launch.