Topic · 130 guides
Before Construction
Prepare effectively with insights on land purchase, permits, and selecting contractors. Constructor guides you through essential pre-building steps to ensure a successful start to your home-building journey. Equip yourself with the knowledge needed for a smooth and informed process.
Post 55: Standing Up the Rediwall Basement Walls
A week after the slab pour, the Rediwall basement walls are going up. How the track goes down, why a swelling waterstop sits under every wall, how the steel goes in, and how we'll waterproof the outside before 200 cubic metres of gravel goes in behind.
Kitchen Layout for a New Home: Getting the Design Right
The kitchen is the hardest-working room in the house and one of the most expensive to change later. Layout types, work zones, islands, storage and the services details to check on your plans before you sign.
Home Warranty Insurance in Queensland: What It Covers
Home warranty insurance in Queensland comes from the QBCC and it's built into your contract price. Here's what it covers, how much it pays, the deadlines that catch people out, and what it won't do.
Post 54: The Basement Slab Is Down, and the Walls Begin
The basement raft is poured in one hit, 228 cubic metres with a 50 metre boom pump and 15 concreters. The day after, we strip the forms, set out the grid on the slab and start getting ready for the Rediwall basement walls.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS