Almost every build runs into a delay of some kind. Rain, a late window delivery, a variation you asked for. When it happens, your builder will often send you an extension of time claim, asking to push back the date for practical completion.
Most homeowners either sign these without reading them or ignore them. Both are mistakes. Each claim changes the date your builder has to finish by, and that date decides whether you can claim liquidated damages if the house runs late. Here's what Queensland law says, and how I'd handle each claim.
C2 - Before Site Start Checklist
$59.00 AUD
Last updated 28 Oct 2026 · Revision 3 · Free updates for life
Checklist Type: Minor
Form Factor: Fillable, print-ready PDF (A4, 22 pages)
When to use: Pre-construction (after contract, before the builder starts)
A 70-point site readiness checklist. Find access, approval, level, service, tree and retaining issues before work begins, so you can plan time and cost before the builder starts.
What an extension of time is
Your contract states a date for practical completion, or how it's worked out, such as a number of days from site start. An extension of time (EOT) moves that date later.
If the builder finishes after the contract date, as extended by valid EOTs, you may be entitled to liquidated damages: a daily amount set in your contract to cover costs like extra rent. So every day of extension the builder gets is a day you can't claim for.
When a builder can claim an extension of time
Under section 42 of Schedule 1B of the QBCC Act, a builder on a regulated contract can only claim an extension of time if the delay was:
- not reasonably foreseeable and beyond the builder's reasonable control, or
- caused by you, the owner, or
- caused by a variation made in line with the Act.
And the claim must:
- be made to you in writing,
- be given within 10 business days of the builder becoming aware, or when they reasonably ought to have become aware, of the cause and extent of the delay, and
- be approved by you in writing.
The builder must not rely on an extension of time unless it claimed in line with those rules. Once you approve a claim, the builder must give you a signed copy within 5 business days.
Common causes and how to think about them
- Rain. More rain than could reasonably be expected may be a valid cause. Check what your contract already allows for wet days.
- Your delays. Late selections, slow finance paperwork or not giving access can all be on you. These are fair claims, so stay on top of your own deadlines.
- Variations. An approved variation that adds work usually adds time. Ask how many days when you sign the variation, and get it written in.
- Trade or supply shortages. Whether these were reasonably foreseeable depends on the facts. A builder is expected to plan for normal lead times.
- Authority delays. Approvals, connections and inspections outside the builder's control may be valid, depending on your contract.
Every contract is different, so read your own EOT clause alongside the Act.
How to check each claim
When an extension of time claim arrives, don't just sign it. Work through these:
- Did it arrive in writing and on time? Note the date you received it. Compare it with when the delay started.
- Is the cause one the contract and the Act allow?
- Is the number of days reasonable? A wet day with no work on site isn't the same as a wet day that actually stopped the critical work.
- Is it double-counted? Two claims for the same days, or rain days already built into the contract, shouldn't add up.
- Does it match your records? Check rain claims against your site diary and the Bureau of Meteorology's daily rainfall for the nearest station.
Then reply in writing. Approve it, or dispute it with your reasons. Don't reject a fair claim out of hand, but don't approve one you haven't checked either. If you don't approve a claim, treat it as disputed and keep your reasons on file.
Keep your own record
The homeowners who come out of delay disputes well are the ones who kept notes at the time. Start a simple site diary from day one: date, weather, who was on site, what stage the work was at, and dated photos. My guide to the site diary done right shows what to record.
Alongside it, keep an EOT register:
- Claim number and date received
- Cause claimed
- Days claimed
- Whether it arrived within 10 business days
- Your response (approved or disputed) and the date
- The revised date for practical completion
That running tally tells you, at any point, when the builder actually has to finish.
Liquidated damages at the end
If practical completion comes after the contract date, as extended, you may be entitled to liquidated damages at the rate in your contract schedule.
- Check the rate before you sign. Some standard contracts default to a token amount if the space is left blank. Base it on your real weekly costs, such as rent or loan interest.
- Work out the figure from your EOT register, not from memory.
- Tell the builder in writing that you intend to claim or deduct them, and how you calculated the amount. Follow the notice steps in your contract.
- Get legal advice before deducting a large amount from a payment. A deduction your contract doesn't allow can put you in breach.
Disputed extensions go through your contract's dispute process, and then to the QBCC and QCAT if needed.
Prevent delays before they start
Some delays you can head off before work begins.
- Walk the site before site start with our C2 Before Site Start checklist. Access, services, levels and approvals sorted early mean fewer stoppages.
- Make your selections on time. Late selections are one of the easiest EOT claims for a builder to justify.
- Keep finance moving. Slow drawdowns can hold up the job.
- Limit variations. Every change adds paperwork and often time. More in my guide to building variations.
The short version
An extension of time moves your builder's completion date, and with it your right to liquidated damages. In Queensland the builder must claim in writing within 10 business days, for a valid cause, and you must approve in writing. Check every claim against your contract and your site diary, reply in writing, and keep a running register.
Read your own contract's EOT and liquidated damages clauses, and talk to a building lawyer before you dispute a big claim or deduct damages.
FAQs
Do I have to approve every extension of time claim?
No. Check it against the Act and your contract, then approve or dispute it in writing with your reasons. Don't reject a valid claim unreasonably.
What if the builder claims an extension weeks after the delay?
In Queensland the claim must be given within 10 business days of the builder becoming aware, or when they ought to have become aware, of the cause and extent of the delay. A late claim may not be valid. Get advice.
Can my builder claim time for rain?
Often, if the rain was more than could reasonably be expected and it actually delayed the work. Check what your contract already allows for wet days.
How do I prove a rain claim is wrong?
Use your site diary, dated photos and the Bureau of Meteorology's daily rainfall records for the nearest station.