Stage 3 · 116 guides
Site & slab
From earthworks to the pour: what to check before the slab covers it.
All guides for this stage: page 4 of 29
Stages of Building a House in Australia: What Happens and What to Check
The seven stages of building a house in Australia, from buying land to the defects period, with the payment and inspection points at each and the checklist to use.
Post 51: Last of the Fill Out, Tanks Backfilled and the Blinding Finished
The last of the fill comes out so the blinding can be finished at the front of the site, the tanks are backfilled, and the steel fixers can get on with the bottom layers of slab steel.
Post 50: A Flying Excavator, Waterproofed Tanks and Backfilling by Kibble
A 70-tonne crane lowers a little excavator into the basement, the stormwater and sewer tanks are fully waterproofed and their pipes lagged, and the sand backfill goes in by kibble.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS