Posts 52 and 53 walk through a real pre-pour slab inspection on the Shearwater job. Part 1 covers the paperwork and the site, and Part 2 checks the slab itself, with sketches from the engineer's drawings and the C5 Pre-Pour checklist alongside.
Project 1: the pre-pour slab inspection
Posts 52 and 53 walk through a real pre-pour slab inspection on the Shearwater job. Part 1 covers the paperwork and the site, and Part 2 checks the slab itself, with sketches from the engineer's drawings and the C5 Pre-Pour checklist alongside.


