All 23 checklists, from C1 to C23, are now Revision 2. The last six were finished on 22 October, so the whole set is now on the same footing.
Every checklist now follows the order you walk the site, starts with a Top 10 card, and has new sketches drawn to true dimensions. Each one also has a "What your builder should be doing" section, a "Documents to collect" box, and a check that every change is signed and priced before the work starts. References are to the NCC 2022.
Each file is certified, so you can check you have the real, current version. If you already bought a checklist, your download now gives you Revision 2.
The earlier updates in this series: Revision 2 checklists for 18 stages, Revision 2.1 for C5, C7, C11, C12, C16 and C17, and Revision 2 for six more checklists with a rebuilt Field Manual.


