Page 29 of 149
Post 31: Fences, Footings and a Dewatering Reality Check
Why our engineer designed the boundary fence footing, and why dewatering must run until the ground floor slab adds enough weight to hold the basement down.
Post 30: Sheet Piling Done Right: Vibration, Pre-Drilling and Neighbours
What we learned: pre-drilling beside shallow fence footings, real vibration readings against DIN 4150-3, a $300,000 saving over secant piles, and latent conditions in your contract.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$629AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS