Page 13 of 149
Post 50: A Flying Excavator, Waterproofed Tanks and Backfilling by Kibble
A 70-tonne crane lowers a little excavator into the basement, the stormwater and sewer tanks are fully waterproofed and their pipes lagged, and the sand backfill goes in by kibble.
Post 49: Pouring the Tank Walls
The stormwater and sewer tank walls get their core fill, pumped in three slow lifts with a small vibrator. What went into the mix, why we trowelled the wall tops while wet, and a quick guide to trowels.
Post 48: A Look Inside the Site Office and the Tanks Braced for the Pour
A quick tour of the site office and the systems that run the job, then a walk round the stormwater and sewer tanks, braced, sealed and ready for the next day's pour.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$629AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS