From earthworks to the pour: what to check before the slab covers it.
All guides for this stage: page 10 of 29
Post 33: Site Housekeeping, Wall Drainage and Panels Lifted Too Green
A walk around the site before the dewatering starts. Safe chemical storage, temporary power, the new walkway, the drainage behind the boundary wall, and what happens when precast panels are lifted too early.
Post 32: Pouring the Boundary Fence Footing Straight Off the Chute
Ten cubic metres of 40 MPa concrete, no pump, and a fence contractor who didn't turn up. Here's how we poured the engineered boundary footing, and what the steel inside it is doing.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS