Stage 1 · 51 guides
Land & planning
Before you buy land: what to check, what to ask, and what the house will cost.
All guides for this stage: page 3 of 13
How Long Does It Take to Build a House in Queensland?
How long does it take to build a house in Queensland? Here's a realistic timeline from first meeting to keys, stage by stage, plus what stretches it and how to plan your rent and loan around it.
The Constructor Field Manual: Know What to Ask, Before You Need to Ask It
A year ago we said our checklists were chonky, and promised to break them down. This is it: every check by stage, with what good looks like, so you know what to ask before you need to ask it.
C21: The Pre-Purchase Inspection Checklist (know what your inspector checks, and what the report really means)
Buying an existing home? Our C21 Pre-Purchase Inspection Checklist walks you through the 103 things a licensed inspector looks at under AS 4349.1, what the report's terms really mean, and how to use the findings before you sign.
Bushfire BAL Ratings Made Simple: What They Mean for Design, Cost & Materials
Building in a bushfire-prone area? What BAL levels mean under AS 3959, what drives your rating, and how it changes design, materials, approvals and cost, especially windows, roofs, vents and ember protection.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS