Stage 4 · 51 guides
Frame & lock-up
Frame and lock-up: what to check before the walls are closed in.
All guides for this stage: page 5 of 13
"The CINS of Your Builder" and Constructor Stage Checklists: Streamlining Quality Control in Construction
Learn how the Constructor CINS system integrates with stage quality management checklists to improve tracking, communication, and resolution of construction quality issues.
Q&A: Floor Wastes in Laundries - QLD based home and the QDC
Does a Queensland laundry need a floor waste, and do you need floor falls? Options, NCC 2022 rules and real costs for linear drains and set-downs.
Pro Clima System vs. Standard Reflective Wall Wrap – A Better Solution for Airtightness
Reflective wall wrap meets the code, but it's rarely airtight. Here's how a taped membrane system like pro clima compares, and when it's worth the extra cost.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$699AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS