Post 46: Steel Fixing, Tanks Formed and Waterproofing Details
The first 18 tonnes of slab steel are craned in, the sewer and stormwater tanks are formed in Rediwall, and the water stops and Sika waterproofing are being detailed before the tanks are backfilled.
The Constructor Site Diary: Your Own Record of the Build
Builders keep a site diary. The Constructor Site Diary is yours: a one-page record for every visit, a weekly wrap, and a stage gate before every payment, so you have dates, names and photos to point to if a question comes up.
One checklist for every stage
Take them on site, tick off each check before you pay, and keep a record if something goes wrong later.
Start here
C1 Before Buying Land
Free
- Check the block before you buy or sign
- Email only, no card
Bundle
Land to Slab
$269save $86
- Every check from buying land to the slab
- The stage where hidden problems get buried
Best value
The Complete Set
$629AUD
- All 25 checklists, land to maintenance
- Includes The Trade Tool and CINS