Building a home is exciting. But the quality of what you get depends heavily on the people running your job: the site supervisor, the contract administrator and the trades. Defects in new homes are common, and many trace back to supervision and training rather than bad materials or bad luck.
This isn't a dig at project builders. Plenty of builders invest in their people. The problem is that when volume targets drive the program, training and quality checks are often the first things squeezed. Your job is to work out which kind of builder you're dealing with before you sign.
Where training gaps show up
Supervisors stretched too thin
A site supervisor is the person meant to check the work on your house. In a volume operation they may be running a large number of sites at once, with targets to move each job through stages. If they're new to the role or under-trained, they may not know what to look for, or have time to look.
Administrators driving the job
Contract administrators keep the paperwork and schedules moving. That's an important job, but it isn't the same as knowing whether the work on site is right. When procedures and deadlines run the job instead of someone with building knowledge, problems slip through.
Trades under time pressure
Most trades are paid per job. Without a supervisor who checks their work, there's little to stop rushed work being covered up by the next trade.
Skipped inspections
The certifier only inspects at a few set stages and checks compliance, not workmanship. If the builder doesn't run its own inspections at key points, mistakes can go unnoticed until handover, when they're harder and more expensive to fix.
Warning signs during your build
- Workmanship problems. Uneven floors, out-of-square door frames, sloppy sealant or paint lines, loose fittings, misaligned windows.
- Poor communication. Questions go unanswered, or nobody seems to know the answer.
- Repeated delays caused by errors. Weather delays happen. Delays because work had to be redone are a sign of skills or planning problems.
- Revolving door of staff. A new supervisor or contact every few weeks means knowledge about your job keeps walking out the door.
- A messy, disorganised site. Poor housekeeping, waste everywhere and no safety controls usually mean nobody is checking much else either.
- Defects blamed on someone else. If every issue is the subbie's fault and nobody owns it, expect a hard time at handover.
How to check a builder's people before you sign
Check the licences
In Queensland, look up the builder's licence on the QBCC online licence search. Ask for the name of your site supervisor and check their licence too. Look at the builder's licence history and any disciplinary records.
Ask about training and supervision
- Who will supervise my job, and how many sites do they run?
- What training do your supervisors get, and how do they keep up with code changes like NCC 2022?
- Do your trades work to inspection checklists or ITPs, and who checks them?
- Can I see a completed quality checklist from a recent job?
- How do you handle defects during the build and after handover?
My C4 Asking the Right Questions checklist has the full list to take into your meetings.
Look at real work
Display homes are built to sell. Ask to see a home under construction, ideally at frame stage before plasterboard goes on, so you can see the work that gets hidden. Look for clean, accurate work and a tidy site.
Talk to past clients
Read reviews, but also ask for references and ring them. Ask how defects were handled and whether they'd build with the same builder again.
Get a clear specification
Ask which brands and products you're getting for cabinetry, flooring, appliances and fittings, and get it in writing. Cheap inclusions that look fine on handover day can wear out quickly.
How to get the best from a project builder
For many first home buyers, a project home is what the budget allows, and that's fine. Project builders deliver a lot of homes at a good price. To get a good result:
- Get independent stage inspections. An independent inspector at slab, frame, enclosed and practical completion is money well spent.
- Use stage checklists yourself. My checklists cover each stage from slab to handover, so you know what to look for on site.
- Know your contract. Understand the inclusions, variations process and defects procedure before you sign.
- Keep records. Take dated photos at every visit and confirm conversations in writing.
- Know your protections. In Queensland you have a 12-month defects period from practical completion under the standard QBCC contract, plus QBCC home warranty cover. Non-structural defects need to appear within 6 months and be lodged within 7 months to be covered by the warranty scheme.
The bottom line
A well-trained, well-supervised team builds a better home. Plenty of builders invest in their people. Your job is to find out which ones before you sign. Ask the questions above, check the licences, and keep an eye on the work as it goes up.


