Builders are still going broke. ASIC figures show about 3,600 construction companies entered external administration in the 2024-25 financial year, close to a quarter of all company insolvencies in Australia. Not all of them build houses, but enough do that you should plan for the possibility.
Here's how to protect your deposit and your build if it happens to yours. The details below are for Queensland.
C4 - Asking the Right Questions Checklist
$39.00 AUD
Last updated 28 Oct 2026 · Revision 3 · Free updates for life
Checklist Type: Minor
Form Factor: Fillable, print-ready PDF (A4, 26 pages)
When to use: Choosing a builder (before you pay a deposit or sign)
70 questions and checks for every builder on your shortlist, from the licence search at your desk to a visit to one of their current sites. Compare like for like and choose your builder with confidence before you pay a deposit.
Before you sign
Check the builder
- Licence. Look the builder up on the QBCC licence search. Check the licence is current, covers the work, and look at their financial category, which sets the maximum annual revenue they're allowed.
- History. Check the QBCC register for disciplinary action or directions to rectify. A builder trading under a new company name after a previous company failed is worth asking about.
- Current work. Visit a house they're building now, not just a display home. Talk to trades on site if you can. Trades who aren't getting paid on time usually know first.
- Workload. Ask how many homes they have under construction and how many each supervisor runs.
Understand what you're buying
- Building contract on your own land. You pay progress payments as each stage is completed.
- House-and-land package. Usually two contracts: one for the land and one for the build, with a land loan and a construction loan. Make sure the building contract is a proper QBCC-compliant domestic building contract.
- Off-the-plan unit or townhouse. A different arrangement. You typically pay a 10% deposit (held in trust) and the balance at settlement, so you're less exposed to the builder failing mid-build, but you're exposed to long delays and the project not proceeding.
Read the contract
Consider having a building lawyer review it before you sign. Look for:
- A finance clause, so you don't lose your deposit if your loan isn't approved.
- What's included. Fencing, landscaping, driveways, window coverings and site costs are commonly excluded from advertised prices.
- How variations are priced and approved.
- The payment schedule (see below).
My Asking the Right Questions checklist covers what to ask the builder.
Insurance
In Queensland, residential building work over $3,300 must be covered by the Queensland Home Warranty Scheme, run by the QBCC. The builder must pay the premium before starting work. Get confirmation of the policy before you pay your deposit, and check it on the QBCC website.
The scheme can cover:
- Non-completion, if your contract is properly ended because the builder defaults, becomes insolvent and loses their licence, dies, or the company no longer exists. This includes loss of deposit.
- Defects, including structural defects for up to 6 years and 6 months, and non-structural defects that appear within 6 months of completion.
- Accommodation, up to $5,000 (or $10,000 with optional additional cover) if a claim is approved after work has started.
There are limits. The maximum payout for non-completion, defects, accommodation, vandalism and theft combined is $200,000 for standard cover, or $300,000 if optional additional cover was taken out. If finishing your house costs more than that, you pay the difference. That's another reason not to pay ahead of the work.
When Victorian builder Porter Davis collapsed in 2023, many customers discovered their insurance had never been taken out. Don't assume. Check.
Payments
- Deposit. For a Queensland domestic building contract of $20,000 or more, the builder can't ask for more than 5%.
- Progress payments. Pay only for stages that are actually complete: base, frame, enclosed, fixing and practical completion are the usual stages. Inspect, or have an independent inspector check, before you pay.
- Avoid front-loading. A schedule that asks for a big share of the price early leaves you with less money left when you need it most. If the builder fails, you've paid for work that hasn't been done.
- Keep a contingency. Prices and site conditions change. Have money set aside rather than borrowing to the limit.
What to do if your builder fails
- Stop paying. Don't pay any further claims until you know what's happening.
- Secure the site and your records. Take dated photos of the house, collect your contract, variations, receipts, insurance details and correspondence.
- Contact the QBCC early. They can explain your options and whether your situation qualifies for a home warranty claim.
- End the contract properly. A non-completion claim generally needs the contract to have ended in one of the ways the scheme recognises. Get advice before you terminate. Getting this wrong can jeopardise your claim.
- Lodge your claim on time. For incomplete work, claims must be made within 2 years from when work started (or the contract date if it never started) and lodged within 3 months of the contract ending.
- Talk to your lender. Your construction loan will need to be restructured with a new builder.
- Get a new builder's price. The QBCC process will involve quotes to complete the work.
The bottom line
You can't control the building industry, but you can control who you sign with, what you pay and when. Check the licence, see the insurance before you pay a cent, never pay ahead of the work, and keep good records. If the worst happens, those four habits make all the difference.