Builder upgrades are where a lot of new home budgets come unstuck. Some are worth every cent because they're hard or impossible to add later. Others are nice to have but cheaper to do yourself once you've moved in. And some things sold as upgrades are now required by the building code anyway.

Here's how I'd think about it for a Queensland new home.

C20 - What You Should Know When You Design Your New Home

$59.00 AUD

Last updated 28 Oct 2026 · Revision 3 · Free updates for life

Checklist Type: Minor

Form Factor: Fillable, print-ready PDF (A4, 42 pages)

When to use: Design stage: before the plans and specification are finalised and before you sign

A 134-check guide to work through with your designer while the plans are drawn. Settle the block, the sun, the layout, the energy rating, the services and the contract early, so a change costs a redraw, not a variation.

Preview C20

See all our checklists

Buy C20 – $59

Lock upgrades in before you sign

The most valuable advice I can give: decide on your upgrades before you sign the contract.

  • Post-contract variations cost more. Builders usually add a margin and an admin fee to every variation, and some charge a fee just to redraw plans.
  • Get every upgrade itemised. Ask for a price for each item, not a "package". Packages often bundle things you don't need with things you do, and make it hard to compare builders.
  • Make sure it's in writing. If an upgrade isn't in the contract, specification or a signed variation, assume you're not getting it.

What's now standard, not an upgrade

Under NCC 2022, two big changes apply to most new homes in Queensland:

Livable housing. Since 1 October 2023, most new houses in Queensland must meet the Livable Housing Design Standard. That means, as a minimum:

  • A step-free path to the home and a step-free entrance door
  • Wider doors and corridors on the entry level
  • A toilet on the entry level
  • A step-free (hobless) shower
  • Reinforced walls around the toilet, shower and bath so grab rails can be fitted later

If a builder offers these as upgrades, ask why. Going beyond the minimum, such as wider corridors throughout, a fully accessible bathroom or a Gold-level livable design, is a genuine upgrade.

Energy efficiency. Most new homes now need a 7-star NatHERS rating plus a whole-of-home energy budget. Your builder has to meet this anyway, so check how they're doing it. Better windows, insulation and orientation are often a better way to get there than relying on the minimum.

Upgrades worth doing at the start

These are the ones that are expensive, messy or impossible to add later.

Structure and slab

  • Concrete strength. Ask your engineer whether N25 or N32 concrete is worthwhile, for durability, near the coast, or under large tiled floors. Keep in mind that your slab design for your site class does far more to resist reactive soil movement than concrete strength alone.
  • Ceiling height. Going from 2400 mm to 2550 mm or 2700 mm makes rooms feel much bigger and can't be changed later.
  • Roof storage. Trusses can be designed with a stronger bottom chord and flooring to give you storage in the roof space, accessed by a drop-down ladder. It must be designed into the trusses, not added after.

Insulation and windows

  • Better windows. Look at the WERS rating. Better glazing and frames on the east and west sides make a noticeable difference in a Queensland summer.
  • Roof insulation. Insulation blankets (often called Anticon) under a metal roof reduce heat and rain noise.
  • Wall insulation. Acoustic batts in bedroom, bathroom and media room walls are cheap during frame stage and almost impossible afterwards.
  • Garage door seals and insulation. Worth it if the garage is attached to living areas, to cut heat and dust.

Electrical and data

  • Data cabling. Have a registered data cabler pre-wire Cat6 to each room, the TV points and ceiling locations for wireless access points at rough-in. In Australia, fixed data cabling must be installed by a registered cabler; setting up the network equipment afterwards can be a DIY job.
  • Security camera cabling. Run Cat6 to the eaves for future cameras, even if you don't buy cameras yet.
  • Solar-ready and battery-ready. If you're not putting in solar straight away, have the switchboard sized for it and conduits run from the roof to the board and to a likely battery spot.
  • Extra power points. Add them where you'll actually use them: bedsides, kitchen island, garage, outdoor areas (weatherproof). It's the cheapest upgrade with the biggest everyday payoff.
  • EV charger circuit. Even if you don't have an electric car, a suitable circuit to the garage is cheap now.

Plumbing

  • Rainwater tank plumbed to the toilets and laundry. Check what your council requires, as some areas already need one.
  • Extra external taps, especially at the front and back of a big block.
  • In-slab or in-wall plumbing for anything you might want later, like a future ensuite or outdoor kitchen. Penetrations through the slab are far easier before the pour.

Upgrades you can leave until later

These are often cheaper outside the builder's contract, after handover:

  • Solar panels and batteries (once the cabling and conduit are in place)
  • Epoxy flake garage floors
  • Floor coverings in bedrooms
  • Light fittings, beyond the basic points
  • Smart locks, garage door openers, floodlights and smart home gear
  • Fencing, landscaping, irrigation and outdoor kitchens
  • Window furnishings

Check what you're allowed to do before handover, though. Some builders don't allow other trades on site until handover, and some estates require fencing and landscaping to be finished by a set date.

Kitchens and bathrooms

Kitchens and bathrooms sell homes, but they're also where upgrade costs balloon. Spend on things that are hard to change: layout, plumbing positions, splashback height, drawer packs instead of shelves, and more power points. Benchtop materials, tapware and handles can be upgraded within your budget, but get each one priced separately so you can see where the money is going.

When each decision is needed

  1. Before contract: everything structural, ceiling heights, layout, slab penetrations, windows, insulation, data and electrical layout, livable housing upgrades. This is where most upgrades belong.
  2. Before the slab pour: any in-slab plumbing or conduits, and in-slab heating if you want it.
  3. Before frame stage ends: blocking for TVs, wall-hung toilets, heavy shelving and extra grab rails.
  4. Before plasterboard (enclosed stage): data, electrical and security cabling, insulation and acoustic batts. Check these are all in before the walls are closed.
  5. After handover: the items listed above that are cheaper to do yourself.