What's changed on the site

Changelog

Updates and fixes to Constructor, newest first.

  1. Improved

    Steel-cap sneakers guide updated for 2026

    Our steel-cap sneaker guide is rewritten for 2026: new picks you can buy in Australia, checked against AS 2210.3:2019, plus how to read the label and when to wear a boot instead.

  2. Improved

    Field Manual Volume 1 updated

    Volume 1 now includes the updated frame checks (412 pages, 1,809 checks) with a new preview. Part 1, Your land, now opens with a note on how to read each item, and every section ends with a reminder to ask your designer or builder what a ticked item means for design, cost and time.

  3. Improved

    Faster, easier-to-read homepage

    The homepage no longer jumps as it loads, guide images are smaller WebP files, and the stage labels are darker so they are easier to read.

  4. Improved

    Queensland build time guide updated

    Our guide to how long it takes to build a house in Queensland has a new timeline diagram and updated figures: 9 to 12 months to site start, 5 to 10 months on site, and up to 2 years with delays.

  5. Improved

    Clearer tables in 27 blog posts

    Screenshots of tables from Standards, contracts and guides are now real tables written in our own words, each with a note on where the figures come from.

  6. Improved

    Frame Stage checklist (C7) version 2

    C7 now follows your walk from the desk to the roof space, with 19 technical sketches, a top 10 page and what to do if a key check fails. Existing buyers get the new version free.

  7. Improved

    Checklist posts: at-a-glance overviews

    Every checklist post now has a clear at-a-glance overview of its sections and check counts.

  8. Fixed

    C19 safety checklist preview fixed

    The C19 Periodic Safety Inspection preview now shows three pages of real safety checks (documentation, electrical, heights, stairs and safe working) instead of erosion and sediment control.

  9. Improved

    Licensed photos across the blog

    119 guides now use credited Unsplash photos in place of unlicensed stock images, and off-topic product shots were removed.

  10. Added

    Quality Forms Starter Pack now on sale

    17 quality forms for checking your own build, from the NCR and defects register to the progress claim check and site instruction. Every form as a print-ready PDF and an editable Word file, A$39, and included in The Complete Set.