Changelog
Updates and fixes to Constructor, newest first.
-
Improved
Homepage leads with the latest guides
The latest guides now sit right under the opening, followed by the build stages and the Project 1 diary, then the book and checklists.
-
Improved
Glossary updated for the Revision 2 checklists
The glossary has 50 new terms from the Revision 2 checklists, such as hold point, flood test, ESC plan, waffle pod and concrete cover. Several figures were corrected, duplicates merged, and there's a new Test yourself quiz.
-
Improved
Checklists page shows Revision 2 details and certificates
Every card on the Checklists page now shows its Revision 2 checks, pages and sections, and links to its current authorship certificate. C4 Asking the Right Questions now includes good answers for every question, so the separate Explainer has been retired.
-
Added
Building Without Regret: sign up and choose your size
Building Without Regret goes on sale on 30 November. You can sign up for one email when it does, and the book page now offers two softcover sizes, both delivered in Australia: Crown Quarto (A$69.95, 442 pages) or A4 (A$89.95, 380 pages). The book banner also takes just one line on a phone now,...
-
Improved
Revision 2 for six more checklists, and a rebuilt Field Manual
C1 Before Buying Land, C4 Asking the Right Questions (now with the Explainer's good answers built in), C13A Waterproofing Design, C20 Design Your New Home, C22 Colour Selections and C23 Driveways and Paths are on Revision 2, with C7 at Revision 2.3 and C13B at Revision 2.2. Field Manual Vo
-
Improved
Field Manual: Revision 2 edition
Both volumes are rebuilt from the Revision 2 checklists: 2,540 checks with the current check codes, Revision 2 sketches, and the trench, waffle pod slab and photograph-it updates. Volume 1 is now 436 pages and Volume 2 276, and existing buyers get the new files free in their downloads.
-
Improved
Revision 2.1 checklists: C5, C7, C11, C12, C16 and C17
Each now ends with a 'What your builder should be doing' section listing the records to ask for. C7 adds a raised-floor section, C16 is Revision 2.2, and the slab, roof, waterproofing, painting and safety checklists now say to photograph issues and ask the builder to mark them. Existing bu
-
Improved
Revision 2 checklists for 18 stages
C2, C3, C4A, C5, C6, C8 to C19 and C21 have been rewritten in the order you walk the site, each with a 'Check these 10' card and a 'Documents to collect' box. Existing buyers get the new files free in their Polar downloads.
-
Improved
The Trade Tool is now a free fillable job book
The free Trade Tool is now a 22-page fillable A4 job book you can fill in on your phone or PC, or print at home. Job numbers link the job sheet, week diary, variations, delays and money pages.
-
Improved
Quality Forms Starter Pack revision 3
The F4 Variation Check form has a clearer tip, and the pack now shows its authorship certificate on the Checklists page and on the pack's post.