Anthony Painter
Anthony is a construction professional with more than 24 years of experience in residential construction with a bachelors degree in Construction Management + Cert 4 in Waterproofing + WHS Officer
Post 5: Project 1: Building Site Setup: The Basics
Going beyond the plans, we break down the first steps of a construction project. From demolition and lay-down areas to site amenities and permits, this is the real-world guide to setting up a safe, efficient worksite.
Post 4: Project 1: 15-11-25 Something new. 100% electric utes.
Get an exclusive first look at the Tembo 100% electric utes, the first of their kind in Australia. We take a quick look at the single cab and mine-spec dual cap prototypes, covering charging, key features, and our first impressions ahead of their 2025/26 launch.
Post 3: Project 1: 15-11-2025 Powering Progress: An Approach to Temporary Site Services
Our temporary power plan is set! Using a "jump-up" strategy with distribution boards, we'll ensure safe, organized power across the site, eliminating cable runs and even providing charging for electric utes.
Post 2: Project 1: 15-11-2025 Inital site walk observations
Join the site walkthrough as we preserve a protected tree and navigate construction challenges, from locating a hidden sewer line to planning for temporary power and meter box placement
C15: Your Ultimate Painting Inspection Checklist (from design to execution)
You don't need to be a painter to ensure a top finish on your new home. In this post we walk you through our painting checklist to help you oversee your builder's painting work, protect your investment, and ensure a best result.
C14 Checklist: The Homeowner’s Guide to Ceramic Tile Design & Installation
Planning ceramic tiling in your new home? The C14 Ceramic Tile Design & Installation Checklist is your step-by-step guide to getting it right the first time. From material selection to installation quality checks, we break it down so you can protect your investment and avoid costly rework.
C12 The Fixing Stage Checklist: Your almost done!
The fixing stage is when plasterboard, cornices, joinery and tiling lock your home’s interior in place. I’ll walk you through the C12 Fixing Stage Checklist that helps you inspect gyprock, joinery, eaves, and tiling to avoid future issues.